SEUK – NESO Connection Reforms Proforma

The purpose this consultation is to provide an overview of the process that NESO and Transmission Owners (TO) are following when assessing applications to connect generation, storage and transmission connected demand that have met the Gate 1 Criteria or the Gate 2 Readiness Criteria, to set out the Gate 2 criteria for both new applications and existing applications and the evidence requirements and assessment of this criteria and to explain how projects will be designated by NESO within the reformed electricity transmission connection process.


SEUK welcomes the opportunity to respond to NESO’s consultations connection reform. In our response, we set out recommendations on connections network design methodology, gate 2 criteria methodology and project designation methodology.